Skip to main content

Tagged: Planned Maintenance

  • Workday Release 2026R1 Coming March 14

    The first of Workday's two major releases in 2026 of enhancements and new functionality (Workday 2026R1) is scheduled to move to production on Saturday, March 14, from 2 a.m. to 5 a.m. Workday will be unavailable during the maintenance period. There are relatively few changes for this release, and the focus is on user interface changes to the Home and Search pages including repositioning the global search bar on the Home page and updating how pinned categories are displayed on the Search page. More details and a job aid link are available in the full post.
  • Planned Maintenance and Downtime for Student Apps. March 14

    From 5 p.m. on Saturday, March 14 to 11 a.m. on Sunday, March 15, multiple PeopleSoft Buckeye Link services (Campus Solutions/Student Information System) will be unavailable. See full post for details.
  • Planned Maintenance and Downtime for Student Apps. Nov. 16

    From midnight to 11 a.m. on Sunday, November 16, multiple PeopleSoft Buckeye Link services (Campus Solutions/Student Information System) will be unavailable. See full post for details.
  • Planned Maintenance and Downtime for Student Apps. Sept. 13 and 14

    From 5 p.m. on Saturday, September 13, until 11 a.m. on Sunday, September 14, multiple PeopleSoft Buckeye Link services (Campus Solutions/Student Information System) will be unavailable. See full post for details.
  • Changes Coming Sept. 20 with Workday Release 2025R2 

    The second of Workday's two major releases of enhancements and new functionality in 2025 will move to production on Saturday, September 20. Workday will be unavailable from 2 a.m. to 5 a.m. while the release is applied. See the full post for details about the upcoming changes, including a link to a job aid. The job aid will be updated regularly as new information becomes available, leading up to and through the release on September 20.
  • Planned Maintenance and Downtime for Student Apps. May 18

    From midnight to 11 a.m. on Sunday, May 18, multiple PeopleSoft Buckeye Link services (Campus Solutions/Student Information System) will be unavailable. See full post for details.
  • Planned Maintenance and Downtime for Student Apps. March 15 and March 16

    From 5 p.m. on Saturday, March 15 to 11 a.m. on Sunday, March 16, multiple PeopleSoft Buckeye Link services (Campus Solutions/Student Information System) will be unavailable. See full post for details.
  • Planned Maintenance and Downtime for Student Apps. Feb. 8 and Feb. 9

    From 5 p.m. on Saturday, February 8 to 11 a.m. on Sunday, February 9, multiple PeopleSoft Buckeye Link services (Campus Solutions/Student Information System) will be unavailable. See full post for details.
  • Planned Maintenance and Downtime for Student Apps. Nov. 16 and Nov. 17

    From 5 p.m. on Saturday, November 16 to 11 a.m. on Sunday, November 17, multiple PeopleSoft Buckeye Link services (Campus Solutions/Student Information System) will be unavailable. See full post for details.
  • Visual Changes on Workday Project Summary

    Effective immediately, the following unused fields will be hidden on a project’s summary Workday page: Billable, Customer, Include Project ID in Names, Optional Balancing Worktags, Optional Project Hierarchies, and Project Currency.

    These fields will still appear on existing reports.