Skip to main content

Fall Semester Classroom Updates

  • Ag Engineering Room 100 before renovation.
    Ag Engineering Room 100 before renovation.
  • Ag Engineering Room 100 in construction.
    Ag Engineering Room 100 in construction.
  • Ag Engineering Room 100 after renovation.
    Ag Engineering Room 100 after renovation.
  • Ag Engineering Room 103 after renovation.
    Ag Engineering Room 103 after renovation.
  • University Hall Room 066 and 072 before renovation.
    University Hall Room 066 and 072 before renovation.
  • University Hall Room 066 and 072 after renovation.
    University Hall Room 066 and 072 after renovation.
  • University Hall Room 090 before renovation.
    University Hall Room 090 before renovation.
  • University Hall Room 086 before renovation.
    University Hall Room 086 before renovation.
  • University Hall Room 086 and 090 were combined into one room after renovation.
    University Hall Room 086 and 090 were combined into one room after renovation.
  • Bricker Hall second floor common area was renovated.
    Bricker Hall second floor common area was renovated.
  • Bricker Hall second floor seal.
    Bricker Hall second floor seal.
  • Smith Lab common area renovation wall art.
    Smith Lab common area renovation wall art.
  • Podiums in large lecture halls received a renovation as well with Block O's being places on the front.
    Podiums in large lecture halls received a renovation as well with Block O's being places on the front.

    Over the summer, the classrooms team was hard at work updating technology in classrooms and renovating entire spaces.

    The Ag Engineering Building had two classrooms completely renovated. Ag Engineering 100 and 103 updated their room layouts to an interactive learning space model.

    For University Hall, it was a similar story. University Hall Rooms 066 and 072 as well as 086 and 090 were combined together and made into open classroom spaces.

    Bricker Hall and Smith Lab had updates to their informal spaces with new carpet and furniture. Smith Lab, specifically, has a new interactive art wall where students can find a hidden Brutus.

    Podiums across campus also received a face lift with Block O branding being added.

    For technology updates, mobile connect has been expanded for use in more classrooms across campus. Additionally, the Baker Systems Engineering Building and Scott Laboratory received large technology upgrades.